FAQ

FAQ

FAQ

How is server maintenance service charged?

Maintenance fees are mainly quoted based on the number of equipment, brand models, and service levels (response time, on-site availability, spare parts method). We provide various modes including annual full-machine maintenance, per-repair service, and single inspection. Free maintenance solutions and quotations can be provided based on your equipment list, with no hidden fees. Welcome to submit your equipment list online for a quotation.

Can you provide on-site repair service? Which cities are covered?

Yes. We provide on-site inspection, repair and deployment services, covering key cities nationwide. Local engineers can arrive quickly; for remote areas, remote diagnosis can be handled first, and engineers can be arranged to travel if necessary. Specific coverage and on-site timings can be confirmed with customer service.

What is the response time for hardware failures?

We provide 7×24-hour emergency response. Contracted maintenance customers enjoy priority response channels: phone/remote immediate access, remote intervention within 30 minutes for critical business faults, and on-site arrival time agreed by city level, minimizing business interruption to the maximum extent.

How long is the warranty for repaired equipment?

Repaired and replaced parts come with warranty. Original parts generally have a warranty of 3 months to 1 year (depending on part type), and repair workmanship also comes with warranty commitments. Same fault can be repaired free of charge within the warranty period. Specific warranty period will be clearly marked on the repair order.

Is the quality of second-hand server equipment guaranteed?

Guaranteed. All second-hand equipment we sell undergoes strict testing (power-on self-test, stress testing, component health check), with condition and warranty status truthfully disclosed, and corresponding warranty services provided. Second-hand equipment offers high cost-effectiveness, suitable for budget-limited or testing/non-critical scenarios. Purchase with confidence.

Can you assist with data migration and system deployment?

Yes. We provide one-stop services from equipment racking, system installation, cluster deployment to data migration, supporting Oracle database migration, RAC setup, GPU computing platform deployment, etc. During migration, we focus on data security and business continuity, and can arrange maintenance window operations.

Are the replacement parts original?

We have our own spare parts warehouse, stocked with a large number of original and used parts for NVIDIA and Oracle servers. For repair and replacement, we prioritize using original parts and truthfully inform the source of spare parts (brand new original/original used), ensuring quality traceability. Key spare parts come with warranty.

Can you serve customers in other cities?

Yes. In addition to local on-site service, we serve customers in different cities through remote diagnosis, spare parts express delivery, on-site resident/assignment and other methods. Many long-term maintenance customers are distributed across the country. Through remote operation and maintenance platforms, efficient responses can be achieved, with remote service offering the same quality and price as local service.

What is the difference between NVIDIA B300 and H200, and which should I choose?

B300 uses the Blackwell Ultra architecture with 288GB HBM3E per GPU, 8TB/s bandwidth and about 15 PFLOPS NVFP4, favoring large-model inference and long context. H200 uses Hopper with 141GB memory and about 1979 TFLOPS FP8, shares the H100 software stack, and suits mixed training and inference on a tighter budget. Choose B300 for inference-heavy, very large models; choose H200 for training-heavy work that reuses existing H100 experience.

How much memory does a B300 have, and what is the total for an 8-GPU server?

Each B300 GPU has 288GB of HBM3E with 279GB usable and 8TB/s bandwidth. An 8-GPU DGX B300 system provides about 2.1TB of total GPU memory, roughly 144 PFLOPS FP4 and 72 PFLOPS FP8, nearly double the roughly 1.1TB available on an 8-GPU H200 system.

What size model can 141GB of H200 memory handle?

One H200 with 141GB can roughly serve a 70B-parameter model in FP16. An 8-GPU system with about 1.1TB total memory supports 400B-class models for multi-GPU inference or mid-scale training. With FP8/FP4 quantization, tensor parallelism and longer context, the practical model size changes and should be calculated from the model structure.

B300 draws 1400W per GPU — what power and cooling does the data center need?

B300 draws about 1400W per GPU, with an 8-GPU system approaching 10-12kW at full load. Plan 1.3-1.5x power headroom, redundant supplies on separate PDUs and UPS backup. Cooling should be strong air or liquid, with hot and cold aisle separation and 20-25 degrees C intake. Assess power and cooling before deploying B300 in an older facility.

Are B300 and H200 servers in stock or built to order, and what is the lead time?

We supply from stock and build-to-order. Standard 8-GPU B300 and H200 servers are usually available quickly, while custom CPU, memory, storage and InfiniBand configurations are scheduled to order. Lead time depends on GPU supply and factory scheduling. For urgent projects, choose a standard in-stock configuration and expand later.

Can a B300 be used on a standard server motherboard? What is the difference between SXM and PCIe?

B300 is primarily shipped as an SXM module that needs an HGX baseboard with dedicated power and cooling, so it cannot be plugged into a standard PCIe server motherboard. SXM uses NVLink for high-bandwidth GPU-to-GPU communication and suits 8-GPU systems. PCIe cards install more flexibly in general servers but offer much lower interconnect bandwidth, so SXM is preferred for large-scale training and inference.

Is H200 compatible with H100, and can an existing H100 cluster be upgraded?

H200 and H100 share the Hopper architecture, and CUDA, kernel libraries and mainstream training frameworks are largely compatible, so application migration is cheap. However, H200 has 141GB memory and 700W power, so the baseboard, power and cooling must match H200 specifications; you cannot simply swap H100 cards in place. For expansion, buy H200 servers and interconnect them with the existing H100 cluster over InfiniBand.

What is included in a B300/H200 server quote, and how does warranty work?

A complete server quote generally includes GPU, CPU, memory, local storage, power supplies, fans and chassis. InfiniBand switches, cables, rack power distribution and software licenses are usually quoted separately. New servers carry manufacturer warranty, while refurbished modules are covered for 3 to 12 months. Confirm the warranty start date, coverage and spare-part response time in the contract.

Should I buy refurbished or used B300 and H200 GPUs, and how do I inspect them?

Refurbished parts are viable if risk is controlled: verify GPU model, serial number and memory capacity, run memory diagnostics and extended stress tests, check driver logs for XID errors, observe full-load temperature and power, and confirm no repair traces on the module. Choose a supplier that provides test reports and at least 3 months warranty; use new servers for critical production.

Does B300 support FP4, and how much does it affect inference cost?

B300 natively supports NVFP4 with about 15 PFLOPS dense compute, a major improvement over the previous generation. Using FP4 quantization in inference workloads where accuracy permits raises per-GPU throughput and reduces the number of cards required, lowering cost per token. Quantization does introduce accuracy loss, so evaluate it on your own workload data before production.

What switches, cables and NICs are needed to network an 8-GPU H200 cluster?

Inside the node, the eight H200 GPUs communicate over NVLink and need no external switch. For multi-node clusters, use InfiniBand such as 200G or 400G, or RoCE Ethernet, cabled rail-optimized with matching switches, optics and cables. Keep NIC and switch firmware versions aligned and validate real bandwidth and stability with an NCCL All-Reduce test before going live.

What should I confirm with a data center before racking B300/H200 servers?

Before colocation, confirm available rack power and distribution type, UPS and redundancy, cooling capacity and intake temperature, rack weight and dimensions, network port rates and IP resources, and whether high-density equipment is allowed. An H200 system draws about 8-10kW and B300 more, so standard racks often cannot support it; high-density racks, strong air cooling or liquid cooling may be required. Confirm electricity and retrofit costs with the facility in advance.

Why Do Server Maintenance Quotes Differ by Three Times?

In one sentence: for the same batch of equipment, maintenance quotes can differ by 3x, and the gap comes almost entirely from four variables — whether replacements are new OEM parts or serviceable pulls, whether the SLA is 2 hours or next business day, whether coverage includes software and consumables, and whether spares sit in the provider's own warehouse or are sourced on demand. Align all four before comparing prices, otherwise you are comparing four different things.

Start by taking the quote apart

A server maintenance quote usually consists of six blocks: parts cost, labour and travel, response-tier premium, coverage scope, risk premium (a surcharge for older models) and provider margin. A low quote is usually not a "discount" — some of those blocks have simply been removed.

Cost itemHigh-end optionLow-end option
PartsNew OEM parts, held in stockServiceable pulls, sourced after a failure
Response7×24, 2-hour on-site5×8, next business day
CoverageHardware + OS + inspectionsHardware replacement only
RiskProvider carries the spares stocking riskRisk shifted to the customer as downtime

The real impact of the four variables

(1) Parts: the price gap between new OEM parts and pulls can reach several times, and the remaining life of a pull is unpredictable. Pulls are not automatically wrong for critical equipment, but you have to accept the hidden cost of "maybe two replacements a year".

(2) SLA: 7×24 means paying on-call engineers and maintaining night-time attendance capability — that labour cost is fixed. A cheaper 5×8 next-day quote essentially leaves the out-of-hours risk with the customer.

(3) Coverage: hardware only, or including the operating system, database and middleware? Many low quotes only cover "hardware fault replacement", bill OS-level issues per incident, and end up costing more than all-inclusive cover over a year.

(4) Spares model: own warehouse stock versus on-demand sourcing. The former ties up the provider's inventory capital, so the quote is naturally higher, but the "2-hour on-site" promise is deliverable; the latter promises "as soon as possible", which in practice depends on whether upstream has stock.

How to compare quotes properly

  1. Write a single-scope requirements document: equipment list (with serial numbers), three-tier SLA timeframes, coverage scope, parts requirement (OEM/serviceable) and reporting frequency;
  2. Have every vendor quote against that same document, and reject vague answers such as "our package is more flexible";
  3. Require them to list exclusions — that reveals the real cost better than what is included;
  4. Ask about renewal price increases and per-incident overage rules.

Three warning signs of a low quote

First, the price is clearly below the reasonable range implied by the equipment's residual value, yet 7×24 on-site attendance is promised. Second, the contract's SLA only says "prompt response" without any hours. Third, when asked about spare parts inventory, the answer is "we have very broad channels". When all three appear together, you are almost certainly looking at subcontracting or on-demand sourcing.

Zhonglianda Technology prices maintenance against the equipment list and SLA tier, holds spares in its own 3,000 m² warehouse in Longhua District, Shenzhen, signs 7×24×365 agreements and attends routine faults in Shenzhen within 2 hours. If you want a like-for-like comparison, send the same equipment list to us and two other vendors and compare on identical terms.

Related reading: What to watch for in a third-party server maintenance contract, Which Shenzhen server maintenance provider responds fastest?

GPU Server Dropping Cards or Throttling — How Do You Troubleshoot?

In one sentence: first work out whether the card is dropping off the bus or throttling. A dropped card (the device disappears from the operating system) usually relates to power delivery, the PCIe link, firmware/driver or cooling; throttling (still present but slower) usually relates to the thermal limit, the power limit or ECC errors. The two require completely different troubleshooting orders — mixing them just wastes time.

Step 1: identify the failure type in three minutes

  • nvidia-smi: check whether all 8 GPUs are present — a missing GPU means a dropped card;
  • nvidia-smi -q: check temperature, power, clocks, ECC error counts and Clocks Throttle Reasons;
  • nvidia-smi topo -m: check whether the NVLink/NVSwitch topology is complete — a missing link significantly hurts training throughput;
  • dmesg -T | grep -i xid: Xid errors are the key clue for telling hardware problems from software ones;
  • BMC/IPMI SEL log: look for power supply, fan and PCIe alerts.

Dropped card: check in this order

  1. Power: an 8-GPU chassis can draw 6–10 kW; check the number of PSUs, whether every power cable is connected, and whether a single feed has dropped out;
  2. Physical connections: GPU-to-riser gold fingers, riser-to-motherboard slots and NVLink bridges may be loose;
  3. PCIe link: lspci -vv shows link speed and width degradation; AER errors indicate a link problem;
  4. Firmware and driver: mismatched GPU firmware, motherboard BIOS and driver versions are a common trigger, especially with a new card in an older platform;
  5. Cooling: excessive inlet temperature triggers protective shutdown, which shows up as "it drops after running for a while";
  6. The card itself: once everything above is ruled out, swap slots and swap cards to isolate it.

Throttling: watch the three limits

TypeIndicatorWhat to do
Thermal limitGPU/HBM temperature near the maximum, fans already at full speedImprove rack inlet airflow, clean dust, adjust fan curves, check thermal contact
Power limitPower near the cap, Clocks Throttle Reasons shows SW Power CapAssess power headroom, adjust the power cap or schedule jobs in time slices
ECC / hardware degradationECC error counts rising, Xid 48/94/95 appearingTrack the growth rate and replace the card once it crosses the threshold

Xid error code quick reference

Xid 13 (graphics engine exception), 31 (memory page fault), 43 (GPU stopped processing), 48 (double-bit ECC error), 62 (microcontroller halt), 79 (GPU fell off the bus), 94 (contained ECC error), 95 (uncontained ECC error). Of these, 48/94/95 map directly to GPU memory, while 79 usually points to a link or power problem — when 79 appears, check power and the riser first.

When to replace the card and when it is a whole-system problem

If the same card still errors in another slot, the card is at fault; if a new card in the same slot still errors, the motherboard, riser or power is at fault; if several cards fail at once, suspect chassis power and cooling rather than "all the cards are dead". Following this order avoids unnecessary whole-system replacement.

Zhonglianda Technology sells, repairs and maintains both Oracle and NVIDIA GPU servers, with a parts warehouse in Longhua District, Shenzhen. Wear parts for H100/H200 — power supplies, risers, NICs and optical modules — are kept in stock, with 7×24×365 response and 2-hour on-site attendance for routine faults in Shenzhen. If a cluster keeps dropping cards and no root cause is found, run a chassis-level stress and power assessment rather than just swapping cards.

Related reading: H100/H200 procurement pitfalls checklist, How to outsource 7×24 operations for an AI training cluster?

Where to Source Spare Parts Once Oracle Servers Are Discontinued?

In one sentence: once a platform is discontinued, spare parts usually come from three sources — remaining OEM inventory, specialist third-party parts vendors, and the generic refurbished-parts market. Prefer a third party that runs its own parts warehouse, can provide pre-installation test records and issues a warranty; before ordering, always confirm compatibility with part number + serial number + firmware version, not just the model name.

Step 1: establish which layer of "discontinued" you are dealing with

Many buyers conflate three different situations and end up on the wrong path:

  • Platform end-of-life: the model is no longer manufactured, but boards, power supplies, fans and memory may still be in production;
  • Part end-of-life: a specific part number for a board or PSU is discontinued, and there is usually a replacement part number;
  • OEM support expiry: the equipment still works, but the vendor no longer provides hardware warranty or spare parts.

The authoritative reference is Oracle's official product lifecycle documentation (the Lifecycle pages on My Oracle Support); a lookup by equipment serial number is the most accurate. The lifecycle status determines which path you can take — not a channel partner's verbal claim that "that one was discontinued ages ago".

Choosing between the three sourcing paths

PathBest forMain risks
Remaining OEM inventoryEquipment still in support, hard requirement for OEM partsHigh price, unpredictable lead time, discontinued part numbers may already be out of stock
Specialist third-party parts vendorEnd-of-life models, fast on-site replacement neededLarge variance in vendor quality; verify testing and warranty capability
Generic refurbished marketNon-critical workloads, you can test parts yourselfRefurbished parts, unverified substitutes, essentially no warranty

Five details you must provide when requesting a quote

  1. Exact model: for example SPARC T7-2, T8-2 or M8-8 — not just "Oracle midrange server";
  2. Part number: the P/N printed on the board, PSU or DIMM; any substitute part number must be confirmed point by point;
  3. Equipment serial number: used to check configuration and firmware compatibility;
  4. Firmware version: mismatched ILOM or system firmware can prevent the system from booting after a part swap;
  5. Fault symptoms and logs: ILOM event logs and fault LED status greatly shorten diagnosis.

Four checks on delivery

  • Labels and appearance: OEM labels and part-number silkscreen should be legible, with no obvious signs of rework;
  • Firmware check: confirm the new part's firmware is compatible with the installed system, and upgrade before installation if necessary;
  • Installation test: power-on self-test, a clean ILOM log, then a period of production load;
  • Written warranty: warranty period and replacement response time must be written into the contract or purchase order — verbal promises do not count.

Three common traps

First, refurbished parts sold as new: the cosmetics are cleaned up nicely, but the batch behind that part number was discontinued long ago. Second, substituting a "compatible part number": the specifications look identical, the firmware is not, and you only find out at installation. Third, a warranty that only covers "it powers on" but not stable operation — it fails three days later and nobody can agree on responsibility.

Zhonglianda Technology has specialised in Oracle servers since 2003 and operates its own 3,000 m² parts warehouse in Longhua District, Shenzhen, with parts for SPARC T5/T7/T8 and M8 models kept in stock. We provide pre-replacement test records and written warranty commitments, with 2-hour on-site response for routine faults within Shenzhen. To confirm availability of a part number, simply give us the model and the part number.

Related reading: Can an out-of-warranty Oracle server still be covered?, How to choose an Oracle parts supplier in Shenzhen?

How do test and production AI server configurations differ?

Test environments can use refurbished machines and simplified networking; production requires redundant power, InfiniBand high-speed networking, redundant storage and maintenance coverage - stability first.

SPARC minicomputers vs regular x86 servers?

SPARC is Oracle's own RISC architecture, natively matched to Solaris and Oracle Database with strong reliability; x86 is a general-purpose architecture running Linux and Windows with a broader ecosystem.

How many database connections can one SPARC T7-2 handle?

There is no fixed number - it depends on CPU cores, memory and workload type. OLTP typically sustains thousands of concurrent connections; sizing should be based on a business-driven load test.

Can SPARC servers run anything other than Solaris?

Solaris is the native and primary OS; some early versions could run a few Linux distributions, Windows is not supported, and mainstream workloads today run Solaris.

Can SPARC machines be inspected on site?

Yes. On-site hardware log collection and stress testing, with a hardware health assessment report.

Which industries in China still run large SPARC estates?

Banks, insurance, securities, government and telecom legacy core transaction systems - mostly long-standing Oracle database environments.

How risky are SPARC firmware upgrades?

Moderately risky: always back up first, work in a low-traffic window, and prepare a rollback plan.

Can't find what you're looking for?

Contact Us Now
400-865-8652 LinkedIn Email Us
Home Products Inquiry Call